top of page

Project: Bilgola

Client

Project Scope

Construction Point was contracted by homeowners to undertake a complete transformation of their recently purchased residence. Understanding their specific needs and desires, we ensured that the design captured their vision. The project encompassed various aspects, including the removal of the existing kitchen and the installation of a new, tastefully designed Hampton-style kitchen. Structural modifications, such as the removal of walls and the installation of beams, were carried out to expand the kitchen area. Additionally, we sanded and stained the timber floors and refurbished the existing bathroom and WC with high-end finishes.

We also incorporated inbuilt wardrobes, installed downlights throughout the house, painted both the interior and exterior of the building, and added new shutters and blinds. Furthermore, we renovated an existing storage area, transforming it into a modern gym.

To ensure a seamless process, Construction Point engaged consultants, including designers and structural engineers. We maintained effective communication with the clients, keeping them informed and involved throughout the entire project. This approach allowed the homeowners to focus on their daily lives without the burden of managing consultants and contractors.

The scope of work included:

  • Terminating existing services for the demolition of the old kitchen and bathrooms.

  • Removing a structural wall to create an open living area.

  • Installing structural beams to support the modifications.

  • Installing a new Hampton-style kitchen with premium finishes.

  • Incorporating the latest equipment within the kitchen.

  • Relining, waterproofing, and tiling the bathroom and WC.

  • Installing modern fixtures and fittings in the bathrooms and WC.

  • Removing and refurbishing inbuilt wardrobes.

  • Upgrading door handles throughout the residence.

  • Removing existing carpet, sanding back the flooring, and applying a stain.

  • Painting the interior and exterior of the building.

  • Creating a new functional workspace.

  • Converting a storage area into a fully equipped gym.

Through meticulous planning, attention to detail, and effective project management, Construction Point successfully delivered a stunning transformation that exceeded the homeowners' expectations.

Homeowner

Details

Where:

Duration:

Project Size:

Bilgola
2 months
696m2
 

shutterstock_1712804053_1.png

Work with us

bottom of page